For Malls, Offices, Hotels, Hospitals, Schools & IT Parks

Solar Power for Malls, Offices and Commercial Buildings in Tamil Nadu

Rooftop & car-park solar Open access & group captive Battery backup

Commercial buildings pay one of the highest TNEB rates in Tamil Nadu: ₹9.40 a unit on an HT III connection, and more in peak hours. That makes each unit of solar worth more to a mall, hotel, office or private hospital than to a factory on HT I, when the power is used on site. We work out what fits your building from your own bills.

To be clear about what we do: we design and build solar on your premises, help you buy solar or wind power through open access (we are a facilitator, not a power trader), and add battery storage built on certified partner batteries.

Get a free check for your building

In short

  • What you pay now: HT III commercial buildings pay ₹9.40 a unit (₹11.75 at 6–10 am and 6–10 pm) plus ₹608 per kVA a month and 5% electricity tax. A unit that solar replaces costs you about ₹10.24.
  • Rooftop and car-park solar: usually the cheapest unit you can get. With our zero-investment model you put in no capital and pay only for the units you use.
  • Open access: for HT connections of 63 kVA or more. At an assumed ₹4.00 solar price, power lands at about ₹7.57 through third-party and about ₹5.66 through group captive.
  • Battery storage: can cut air-conditioning demand spikes and back up critical loads.
  • Our offer: send your last three EB bills. You get a one-page cost sheet within two working days.

Rates are from TNERC Tariff Order No. 6 of 2025 and were still in force on 11 October 2026. The order allows an inflation-linked rise of up to 6% from 1 July each year; the 2026 rise has not been ordered. Illustrative default values — request a site-specific quotation.

Find your type of building

What each kind of building pays TNEB

TNEB categoryWhoEnergy chargeUnit solar replaces
HT IIIMalls, hotels, offices (government and private), private hospitals, banks, cinemas₹9.40₹10.24
HT IIBPrivate schools and colleges that are not government-aided₹8.25₹8.99
HT IIAGovernment and government-aided schools and colleges, government hospitals, trust hospitals that treat everyone free, NABH hospitals in village or town panchayat areas₹7.75₹8.04* / ₹8.44
HT ICompanies doing IT services, such as software, BPO and data centres (and factories)₹7.50₹8.17
Illustrative default values — request a site-specific quotation. TNERC Tariff Order No. 6 of 2025. "Unit solar replaces" assumes about 15% of solar units fall in the 6–10 am peak (25% extra) and adds 5% electricity tax. *Electricity tax is not charged on supply to the Government for its own use, to local authorities or to railways, except for residential premises (TN Tax on Consumption or Sale of Electricity Act 2003, s.4); government-aided and trust institutions on HT IIA pay it: about ₹8.44. Demand charge (₹608 per kVA a month) is the same for all and usually stays the same with solar, because of the 90% floor.

Three ways to cut the bill

1. Solar on your roof or car park. Power made and used on your own premises skips transmission, wheeling, the surcharges and line losses, so it is usually the cheapest unit you can get. Grid-connected rooftop plants can still carry network charges set by TNERC; we put whatever applies into your numbers. Malls and offices with big car parks can add solar car-park sheds. With our zero-investment model, we fund, build and run the plant, and you pay an agreed rate per unit. The agreement usually runs many years, so read the exit terms first (what to check).

2. Open access or group captive. If your HT connection is 63 kVA or more, you can buy solar or wind power from a plant elsewhere. Because the HT III rate is high, both routes save well for commercial buildings: at an assumed ₹4.00 solar price, about ₹7.57 a unit through third-party and about ₹5.66 through group captive, against ₹10.24 from TNEB. See every charge worked out →

3. Battery storage. Air-conditioning pushes up your demand, and TNEB bills the higher of your highest 15-minute demand or 90% of your contracted demand, so a battery only saves money on demand above that floor. It can also back up critical loads. When a battery pays →

Illustrative default values — request a site-specific quotation. Open access figures assume a 33 kV solar plant supplying an 11 kV connection, with line losses, wheeling, transmission, scheduling, cross-subsidy surcharge and electricity tax counted. They leave out the additional surcharge (none ordered for power used after 30 September 2025; TNPDCL has proposed ₹0.63 a unit on third-party power from October 2026, which would make HT III about ₹8.20 and HT IIB about ₹8.12), Aran's facilitation fee, and, for group captive, the cost of your equity.

Malls, hotels and offices: what to watch

How we work

  1. You send your last three EB bills on WhatsApp, and tell us your roof and car-park space.
  2. Within two working days you get a one-page sheet: your cost today, with rooftop solar, open access and group captive, for your tariff and voltage.
  3. We visit, confirm the roof and the load, and give you a firm proposal.
  4. We build or arrange the supply and handle the TNPDCL approvals.

How we're paid for open access deals: a small facilitation fee on each unit delivered, shared by the generator and the buyer and agreed in writing before anyone signs. We never buy or resell the power.

Common questions

Can a commercial building get solar with zero investment?

Yes. With our zero-investment model we fund, build and run the solar plant on your roof or car park, and you pay an agreed rate for each unit you use. You own nothing and put in no capital. The agreement usually runs many years, so read the exit terms first.

Can a mall or office take open access in Tamil Nadu?

Yes, if it is on an HT connection with a contracted demand of 63 kVA or more. Commercial buildings on HT III usually save more per unit than factories, because their TNEB rate is higher.

What does a commercial building pay TNEB per unit?

HT III commercial buildings pay ₹9.40 a unit, 25% more from 6–10 am and 6–10 pm, plus ₹608 per kVA a month and 5% electricity tax (TNERC Tariff Order No. 6 of 2025). A unit that solar replaces costs about ₹10.24. Illustrative default values — request a site-specific quotation.

Is our building on HT or LT?

It is printed on your EB bill. Larger buildings are usually HT. LT buildings can still have rooftop solar, but cannot take open access in Tamil Nadu.

Get a free check for your building

Tell us about your building. The quickest way is to WhatsApp your last three EB bills; we come back within two working days. No obligation.

Or email your bills to reach@arantec.in

Thanks, we've got your details. The fastest next step: send your last three EB bills on WhatsApp.