Every few months someone with a factory roof, a few spare acres or a farm asks the same thing: "If I put up a solar plant, will TNEB buy the power from me?"
In short
- In Tamil Nadu, selling solar power to the grid means one of three routes: rooftop feed-in or gross metering, a state tender, or PM-KUSUM Component A
- Gross metering is for rooftop plants from 151 kW to 999 kW, and LT consumers cannot use it
- PM-KUSUM Component A is effectively closed to new projects: the extended dates apply only if the PPA or notice to proceed came on or before 31 December 2025
- The other choice is to sell to an HT or EHT factory with 63 kVA or more under open access, where third-party buyers get no banking
- Aran facilitates open access deals between a generator and a buyer. In these deals it does not buy, sell or trade the power
The honest answer is: sometimes, through a few specific routes, and the money is rarely as simple as the brochure says. This article walks through those routes, where payment can get stuck, and why many plant owners end up looking at a factory buyer instead.
First, a word on names. Most people still say TNEB. In 2024 the old TANGEDCO became TNPDCL, which handles distribution and your EB bill, and green energy moved to a separate company, TNGECL. When you sign anything, check which company's name is on the contract, because that is who owes you the money.
Route 1: Rooftop, under net feed-in or gross metering
If the plant is on your roof, there are two ways TNPDCL pays for your power. Both come from TNERC Order No. 8 of 2021.
- Net feed-in. You use your solar first. Units you send out are credited at a lower feed-in rate fixed by TNERC, and the credit comes off your bill. On 31 March you can take any balance as a payment or carry it into the next year. It is open to HT consumers up to 999 kW.
- Gross metering. You sell every unit the plant makes to TNPDCL at the feed-in rate, and keep buying all your own power at your normal tariff. It is for plants from 151 kW to 999 kW, and LT consumers cannot use it.
Net metering, where export is subtracted from import unit for unit, is for homes, not factories.
We are not quoting a feed-in rate here. The last generic rates we could find came from an October 2021 order that ran to 31 March 2023, and we could not confirm what applies today. TNERC is also writing new renewable tariff rules for FY 2027-28 onwards; they are still a draft. Ask your contractor or your TNPDCL office for the order number and rate, and get it in writing.
For a factory that runs in the daytime, selling is usually the weaker choice. Every unit you use yourself replaces a grid unit at your full tariff, while the feed-in rate is lower. Our guide on rooftop solar for HT factories has the limits and approval steps.
Route 2: State tenders, for larger plants
For larger plants there is no fixed buying rate. A state power company runs a tender, developers bid a rate, and TNERC is asked to approve the result. The solar projects TNERC approved earlier in 2026 were reported at 15 MW each, paired with batteries.
This route suits developers who can wait out a tender cycle and carry the bid risk. It is not a way for one factory owner to earn from spare roof space. Rates change from tender to tender, so check the tender in front of you and not a number you heard from someone else.
Route 3: PM-KUSUM Component A, on agricultural land
Component A lets a landowner, or a developer on leased land, build a grid-connected plant of 500 kW to 2 MW and sell the power to the distribution company.
For a new project, this door is effectively closed for now. The current dates are financial closure by 30 November 2026 and commissioning by 31 March 2027, and they apply only if the power purchase agreement (PPA) or notice to proceed was issued on or before 31 December 2025. PM-KUSUM 2.0 has not been notified. Our PM-KUSUM guide explains this in full.
Even before the deadline, Component A stayed well short of its target. Down To Earth (December 2025) put part of the blame on low tariffs, finance, and too little land near substations. It also reports that industry wants stronger payment security in the next version.
If an agent promises you a fixed rate "for 25 years" under this scheme today, ask to see the signed PPA and the TNERC order behind it. If they cannot show you both, stop there.
Where the money gets stuck
This is the part brochures skip. A PPA with a distribution company is a promise to pay, not cash on a fixed date.
- It has improved. The Ministry of Power's Late Payment Surcharge Rules of 3 June 2022 pushed distribution companies to pay generators faster. India Ratings reported falling receivables in most states it tracked by late 2022, with Tamil Nadu among those improving.
- It has not gone away. Figures tabled in Parliament and reported in August 2023 showed Tamil Nadu with the highest current dues of any state on 24 July 2023. That is old data and we found nothing newer, so ask around before you rely on either picture.
- Rules exist, but read your own contract. Since 1 August 2019, a Ministry of Power order has required distribution companies to keep letters of credit as payment security under PPAs. Whether your PPA gives you one is a separate question.
Before you sign, ask four things: which company signs, how many days it has to pay, what late payment surcharge the contract gives you, and what payment security stands behind it. If this income is meant to repay a loan, plan your cash flow for late payment. None of this means don't do it. It means go in knowing who you are selling to.
The other choice: sell to a factory, not the grid
Under open access, your plant supplies another consumer, usually a factory, and the grid is only the wire. TNERC's Green Energy Open Access Regulations 2025 (notified 18 September 2025) allow this for HT and EHT consumers with 63 kVA or more of contracted demand. LT consumers cannot take it.
You agree the rate with the buyer, and the buyer pays you directly. That can work better when your plant is more than a few kW and you want a negotiated rate. But it has real conditions, and they are worth knowing before anyone quotes you a number.
- No banking for third-party sales. A third-party buyer has to use your units as they are generated, so a daytime solar plant needs a daytime load. Agree in writing what happens to units the buyer cannot use.
- Wheeling charge. HT wheeling is ₹1.04 per unit (TNERC Tariff Order No. 6 of 2025). Solar pays 50% under earlier TNERC orders kept in the 2025 regulations, so ₹0.52.
- Cross-subsidy surcharge. Under the same order, for an HT I buyer it is ₹1.99 per unit, and solar third-party sales pay 70%, so ₹1.39. For an HT III buyer it is ₹2.57, so ₹1.80. Group captive deals are exempt, if they pass the 26% and 51% tests.
- Additional surcharge. TNERC's last additional surcharge order (M.P. 13/2025) covered power drawn up to 30 September 2025. Nothing covers power drawn after that date, and new petitions are pending, so the sums could change.
- The buyer's demand charge stays. ₹608 per kVA per month (TNERC Tariff Order No. 6 of 2025) is not reduced by open access, so your rate has to work on the energy part of the bill.
Illustrative default values — request a site-specific quotation.
Open access moves the payment risk; it does not remove it. A factory can pay late too. The difference is that you can check that buyer's accounts, ask for security, and talk to the owner. Do that as carefully as you would with TNPDCL.
Our open access page for Tamil Nadu lists every charge with its date.
What Aran does here. Aran facilitates green open access: it helps a generator and a buyer find each other and guides both through the approvals. In these deals Aran is not a power trader. It does not buy your power, resell it or take title to it. The supply contract is between you and the buyer, and Aran charges a small facilitation fee on each unit delivered, shared by the generator and the buyer and agreed in writing before anyone signs.
One new rule if your plant is not built yet
Tamil Nadu's battery storage policy, reported released on 3 November 2026, is reported to require new solar and solar-hybrid projects of 1 MW and above to add storage of at least 10% of capacity for 4 hours. Reports mention projects commissioned from April 2027. We have not read the government order or gazette notice, and it is not yet clear whether every type of project is covered, so check this before you fix a rate with anyone.
When selling to TNEB is not worth it
- You can use the power yourself. For most HT factories, replacing your own daytime grid units is worth more than selling at the feed-in rate.
- You need steady monthly cash and cannot wait. Payment can run late, so ask how many days the contract allows and what happens after that.
- Your only offer is a PM-KUSUM pitch with no signed PPA. See Route 3.
- A nearby factory has a matching daytime load. Open access may suit you better, once the charges above are counted.
The bottom line
"Selling solar power to TNEB" is really three different things, each with its own order, size limit and payment terms. Get the current order number and rate in writing, ask who signs and what secures the payment, and weigh it honestly against using the power yourself or selling to a factory.